• Sage 300 consolidated receipts batches are posting to the period end instead of the document/posting date of the batch.

    All of sudden Sage 300 consolidated receipts batches are posting to the period end instead of the document/posting date of the batch. All of my March receipts are posting to March 31st regardless of the posting date selected in the batch. Has anyone…