• Planning work order material import for BOM change

    What is the best way to update planning work order material based on the updated BOM? There is no standard import template for MFGMAT. Users requested that they have three old components that is in 189 open work orders that "builds" phantom part# to…
  • Cost production export for comparasion purpose

    Good Afternoon, I need to know if it's possible to export the BOM structure massively and with a connection to the my Sales Products for consulting the consumption history of components, and if possible, also export the Operations for consulting the…
  • Multi-level BOM report with costs

    I need to produce a Multi-level BOM report with costing details and totals. The "Print BOMs" report under common data gives the correct BOM structure, but I'd like this with Material, Labour, Overhead costs - and totals... Does anyone know of such…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • 6 Steps to Generate an Order using Project Management and MRP

    6 Steps to Generate an Order using Project Management and MRP You know how excited I am to detail how to combine PJM and MRP to generate an order? Let's get started... Note: For urgent items, or items with a long lead time purchase orders (PO), work…
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • production planning

    I am more familiar with SAP. How exactly is a Supply Network Plan created in SAGE to get to the point where you can create the Master Production schedules?
  • Manufacturing: machine set up optimizing

    Hello, everyone! We are facing an issue during the production scheduler implementation. The customer uses products characteristics to optimize the set-up time. Let’s say it is 5 hours long for a complete machine set-up, then to change from a product…