Welcome to the Sage X3 Support Group on Community Hub! Available 24/7, the Forums are a great place to ask and answer product questions, as well as share tips and tricks with Sage peers, partners, and pros from around the globe.
Hello All, I have an interesting ask from our User base. We have Word Documents that are required to be printed when ever as a Check sheet each time a user prints a work order. Here's the twist the Word documents are unique to each product or groups of…
When you make a production tracking or a receipt in X3, you get an analysis request; it's one analysis per transaction. I want to be able to append all production trackings under one work order on the same analysis request. Is this possible in Sage X3…
Hi everybody!
I Have in the most of the cases, semi-finished goods inside other semi-finished goods and then the finish good.
Imagine a scenario that i have this kind of BOM:
Product A : Finished good
1 x Product B : Semi finished good
1…
Hello,
On every single work order we create now, we get two popups when clicking "create" button on the WO. We do not have unexpected materials or operations on our work orders and we don't use the Scheduling functionality in X3, although I know the…
Hello All, Can someone explain the reason for these two fields listed in the subject in "Products" screen. I've read the basic break down's from "F1" help, but we are looking for more real world examples and purposes of these two fields. Could either…
Hi all,
Recently started working on Sage x3 and we are required to raise a work order, which pulls information from a BOM and routing.
However when the Work Order is created the product line highlights green, I believe the line normally highlights…
I'm very new to Sage X3. Does anyone know if it's possible to have an image that is attached to a product print on the Job Ticket report maybe as a subreport? I have tried everything I can think of in Crystal Reports but I'm not getting anywhere.
Thanks…
Hi, I need your help! I am in a situation where I firmed a workorder, tracked the materials, production, and operation, but realized the BOM was incorrect. How do I reverse this?
Greetings! We are a while off from having MRP up and running and even with that I believe I will still have to consolidate lines. We are a low volume high mix manufacturer so it is more common that I am making 16 different widgets from 1 material and…
Is there any mechanism in X3 where you can compare what you consume in a work order with what was originally allocated? We have a need to be able to compare the two for any discrepancies to alert us to make tracking modifications, rather than hard-stopping…
Hello!
We are finding that it's become near impossible for us to Close and Cost our work orders prior to our shipments. We run on average costs. To ensure our actuals are close to the expected, does anyone have a breakdown on how Expected Costs are…
Hi,
Our current business process has us creating BTB work orders during Sales Order creation. Sometimes, the material produced from the resulting BTB work order is needed to fullfill a different, more urgent sales order.
We were originally consulted…
Hi,
We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…
Who knows when is the journal entry for STOJOU supposed to be generated from a work order, when you do the production tracking, or when you do WIP posting?
I am testing on a couple of systems and I dont see any STOJOU entry from production tracking…
Hi everybody!.
I must use webservice to create an work order.
I create a web service script with MFG object, and WJMFGXL1 program.
I create a XML parameters with the fields that value is INPUT, but always when I run webservice and invoke this xml…
I have a planned WO that was manually created on 6/3 that was manually created
stock went below the safety stock limit on 5/15
my MRP replanning messages have a 120 backword and foreward lead time, and under "replan dates" it's set to "Early"
…
Do I need to create an alternate routing for every type of work center replacement configuration ?
for example:
if my routing alt 1 calls for work center A
and I set a replacement for work center A to be work center Z and run the optimization function…
Hello It would be interesting to be able to remove a by-product as is possible with the raw materials. But currently, we have the message "by-product: Delete not allowed". Or, in the absence of deletion, allow the exclusion of a by-product.
My products when being produced are placed on a cart and that travels with them as they go work center to work center.
we have a finite number of carts
How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
X3 product update 8 patch 2
Not managed inventory items can be added to a production BOM but when creating a work order an error message is displayed and the not managed item is not added to the work order.
Is this a restriction or is there a configuration…