• Setup routing.

    looking for have routings setup per bottle instead of per minute. They want it to look like a WO done for 500 bottles with a routing of $1 each, will add $500 to the WO for labor. Is it possible?
  • Scheduling Method with Multiple Staged Routings

    Looking for a process to aid in scheduling a job with multiple routing 'prerequisite' steps. Example: Job ABC123 requires preheating prior to manufacturing and cooling post process. Routing 10 Preheat Routing 20 Manufacturing Routing 30…