• Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • ASYRWRKSIG Workflow approval link Error:

    Hi All, Please assist as to what might be a solution to the following error for workflow approval links: {"$diagnoses":[{"$severity":"error", "$message": "X3 engine error: D:\\Sage\\X3APP\\Folders\\X3\\TRT\\ASYRWRKSIG.src : File Non-existent ()…
  • Workflow Rule - Operations

    Good afternoon Folks Does anyone have a good guide to what the operations all mean? I'm trying to have this send 30 days before the date in the field, but I dont think create or modify will work for an even like this.
  • Routings - Copy Routings

    I'm updating BOMs to including a packaging code. I can copy the BOM from the original product by entering the new product code however the BOM routings are not automatically copied over. Is there a way that routings can also be copied over?
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • What are the steps and documentation required for a post implementation support of a SAGE X3 ERP?

    Hello Guys, I am just a newbie here in this forum and hoping to get along with you all. Moreover, I am about to support a newly implemented ERP system in-house through a post implementation phase and am just wondering what are the proper steps and…
  • WORKFLOW/NOTIFICATION

    Hi, Can someone provide step by step on setting up workflow or notification in sagex3. I looked online and could not find anything. I just want to start from the basic like a PO is created, it needs to be approved before it is posted/finalized. Or…