• MRP Settings - Load Calculation and Production Lead Time

    MRP Settings have the load calculation at 26 weeks. The production lead time is set to Routing/Product Lead time From what I can see in the load graphs, I only see load for 6 months. and from the MRP results, I can see that the routing is used for…