• Default Locations within Product-Site

    All, We have default locations setup using product-site within our system. However, there are times when we need more than one location to store products because of space & their replenishment levels. My question, can you add more default locations…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Nice if 'PAC complete' could be on a line by line rule basis - believe would be much more versatile allocation and issue setup

    'Pac complete' as an overall function does not allow smaller units to break into larger units when needed for picking. Those smaller units need to be made manually available (or already available). Our orders need to be shipped in cases and pallets. Pallets…
  • Using/Understanding FIFO

    It seems that X3 defaults to some form of FIFO. Is there any documentation that goes into detail how to control this feature? A specific example of what we are trying to do that relates to full pallet product pulling. We have X3 set up to pull full…
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…