• Importing new components to existing BOMs

    I would like to add additional costing components to existing product BOMs in Sage X3 (v11). When using the import template BOMPD, it requires a field for the BOM component sequence (BOMSEQ), however, each BOM has a different number of existing components…
  • Inventory and Production BOM vs SubContracting BOM

    I am looking to convert a raw material to a subassembly part, via a purchased service. In this case, we have inventory on hand of a raw item, that is then shipped to a vendor, modified by a service they provide, and then it is shipped back and is now…
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • Routings - Copy Routings

    I'm updating BOMs to including a packaging code. I can copy the BOM from the original product by entering the new product code however the BOM routings are not automatically copied over. Is there a way that routings can also be copied over?
  • BOM Component Valuation

    I have a production BOM where I have the same component listed three times. 1. amount of "goop" that is needed to fill the containers for the finished good 2. amount of "extra goop" that is needed to prime the tooling 3. the same "extra goop" to…
  • OPE LT in Production BOM

    Has anyone used this field before? I tried to test it and I never saw the lead time reflected on my component's MRP suggestion.
  • Work order for a special service over a product?

    Is there a way to create a work order to apply a certain service over a product? So the product to consume and produce is the same? We cannot have BOM like this, but we can generate a WO like this, makes sense?
  • Alternative BOM and Routing for Product Versions on the same site

    Hi Enterprise Management Fanatics, We are trying to use product versions and we found that we cannot have 2 different alternatives for the same product x version pair. Why is this a limitation, if we don't use product x version, but just product we…
  • Detail Scheduling Products with similar components

    Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
  • Production: Input item is the output Item

    We have a prodction operation that have the input and the output item is the same. The opération consist on deviding the original itme into multiple part. Exemple : Item A : 2000 meter to devide into tow part : 1500 m and 500 m. Nb: lengths are not standards…
  • Keeping track of carts carrying product used in manufacturing

    My products when being produced are placed on a cart and that travels with them as they go work center to work center. we have a finite number of carts How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
  • Sage X3 Web Services - BOD Object

    Hi, Sage version - X3 update 7 I am trying to work with production bom in X3 using web services. I found that BOD is the object that i need to use and BOMP is the transaction that i need to use. Published it as ZWSBODP. I do have few production…