• Applying a change of standard operations/routings to firm and planned work orders

    Hi, We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…
  • Routing Operation - Formula

    Hello All, We are trying to get away from a predefined STK-OPE conversion within our Routings. I would instead like to use a formula that pulls the needed number from ITMMASTER automatically. I know I need to bring in something like [F:ITM] and grab…
  • Mass replanning

    What does this do? Seems there is no function help.
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • Mobile Scanner using ADC functions

    Good day, Has any one ever worked with the Sage Mobile App in conjunction with ADC functionality in using the device camera as a scanner? Any advice or documents will be highly appreciated. Thanks
  • Sage X3 (Not the Sage HRMS module) integration with SAP SuccessFactors

    FormerMember
    FormerMember
    Has anyone had a need to integrate Sage X3 with SuccessFactors? May you give specific usage scenarios where Sage X3 will need to interact with SuccessFactors please? Example is the need by Sage to use the org structure for approvals and for POs. Thanks…
  • BOM Component Valuation

    I have a production BOM where I have the same component listed three times. 1. amount of "goop" that is needed to fill the containers for the finished good 2. amount of "extra goop" that is needed to prime the tooling 3. the same "extra goop" to…
  • Scalable \ Formula based BOM in Sage EM

    Is it possible to have scalable BOM in Sage EM? For instance, if I define that steel need for bicycle is bicycle size X 2.5 and so on, then giving Bicycle size should explode \ Create the BOM accordingly. Moreover, can I have Height, width and depth…
  • Filter selection dialog when user click on magnifying glass icon

    I'd like to filter the selection dialog when user click on the magnifying glass icon or use ESC F12. In this case we need to filter the Routing codes of one article, the same functionality you see on 'Routings' Manufacturing > Technical data > Routings…
  • production planning

    I am more familiar with SAP. How exactly is a Supply Network Plan created in SAGE to get to the point where you can create the Master Production schedules?
  • Routes with long operation times set up

    Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
  • WIP unbalanced journal

    Hi, on Sage X3 v11, we are getting an error when posting the WIP of unbalanced journal all the accounting codes are setup correctly. we've even put a default GL account on the chart of accounts to post to that account in case we've missed any important…
  • manufactoring cycle

    FormerMember
    FormerMember
    Hello! In my company in Italy we're migrating to Enterprise Management (AKA Sage X3 v11 in Italy). Just some questions regarding manufactoring, especially regarding phases of a cycle. How Sage manage them? and what about phases of the cycle made by subcontractors…
  • Detail Scheduling Products with similar components

    Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
  • Allow recursive BOM

    Is it possible to allow recursive Boms? In another mean Have the output item the same as input item. thanks
  • Adjust cost of finished goods after WO closed and costed

    Hi, On Sage EM v11. we have a case where the users have created a WO, tracked it but did not track the labor time. They then completed, closed and costed the WO. which resulted in getting finished goods but with unreal cost. these finished goods…
  • RCCP in X3

    Does anyone have a blurb or training guide on RCCP and it's relationship to WO scheduling in X3 ?
  • Routings scheduling graph

    Hello, I'm having difficulties with the graph generated in Routings, Scheduling tab then Graph button in the right menu. Even doth my operations are all absolute successor, the graph overlaps production time and doesn't represent the actual time lenght…
  • What is a business use case for Phantom products and Phantom product boms?

    I have not been able to find a lot of training on this topic. The documentation makes mention of it, but I'm curious what "real world" uses there are for phantom products, and boms that are associated to phantom products.
  • Manufacturing: machine set up optimizing

    Hello, everyone! We are facing an issue during the production scheduler implementation. The customer uses products characteristics to optimize the set-up time. Let’s say it is 5 hours long for a complete machine set-up, then to change from a product…
  • Keeping track of carts carrying product used in manufacturing

    My products when being produced are placed on a cart and that travels with them as they go work center to work center. we have a finite number of carts How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
  • Assembly Manufacturing

    We would to setup a client that does assemblies to use manufacturing functions like work orders orders and routings at the same having the ability to dissamble any of the parts at a latter time if the customer returns the product for warranty servicing…
  • Work Center Utilization and Status?

    Hi there, I'm using X3 v.9. I was wondering if there was a feature or a modification where a work center can be put into a certain status.... like "repair" or "conversion"? So that we can track how much the station is being used. Thanks!
  • How often do you run the WIP Accounting Interface?

    Hello, For my fellow manufacturers, how often does your WIP Accounting Interface run? Daily? We are implementing now, and I'm looking for best practices and other factors to consider. Thank you!
  • Sage X3 videos available online

    Just an organized collection of videos found on YouTube. You may find these useful in sales, training, babysitting and support processes… P.S. Many thanks to all authors who did these great videos!!! General * "Sage ERP X3 - Integrated…