• Planning work order material import for BOM change

    What is the best way to update planning work order material based on the updated BOM? There is no standard import template for MFGMAT. Users requested that they have three old components that is in 189 open work orders that "builds" phantom part# to…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • Lot Numbers

    I need to come up with a way to consume containers (what our product is packaged in) when a work order is closed. I have thought keeping the current BOMs for the "master BOM" (bulk BOM if you will) for each product and then doing a second BOM that puts…
  • Applying a change of standard operations/routings to firm and planned work orders

    Hi, We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…