hello i need your help when i produced a product another semi finish product produced like in the example:
Raw Material: Sheet of steel, 100 cm x 100 cm
Semi Finished Product 1: Metal bracket
Amount of raw material needed: 50 cm x 50 cm
Semi…
Can x3 make maintenance management or it's necessary to establish the link to a CMMS software ?
The ideia is to make projects, establish deadlines, objectives, costs and maintain process connected, and if it is possible all in the ERP.
Hello!
We are finding that it's become near impossible for us to Close and Cost our work orders prior to our shipments. We run on average costs. To ensure our actuals are close to the expected, does anyone have a breakdown on how Expected Costs are…
Hello,
We are on Sage X3 2019 R4 (12.0.19).
We are importing raw materials and when the stocks are arrived, we need to issue those into production as we are in a tight planning schedule. Received materials will be issued to production with the average…
Hi all, Our client uses the Calculate Expected cost function (Manufacturing) That prints the Expected cost type report without the actual and expected costs for these workcenters. I've attached reports how it is blank in the first image. However a few…
For a customer we need to include regular stock managed components on a production BOM, but they should not be consumed when doing Production Tracking or when closing a Work Order. They do want to see the cost of these materials included in costs, and…
I have been an X3 users for over 10 years (currently on v12; P18) but I am stumped on this one. It has to do with the standard cost calculation function (CALCSTSTD). I want X3 to calculate the std cost for items which all are contained in a single product…
Hi,
on Sage X3 v11, we are getting an error when posting the WIP of unbalanced journal
all the accounting codes are setup correctly. we've even put a default GL account on the chart of accounts to post to that account in case we've missed any important…
Hello everyone,
I have been asigned to find a way how to apply our average over head cost, $1.62 a gallon, to our finished goods...(keep in mind i do nothing with this part of X3 in my position so im just walking through the dark) On the "standard…
Hi,
On Sage EM v11.
we have a case where the users have created a WO, tracked it but did not track the labor time. They then completed, closed and costed the WO. which resulted in getting finished goods but with unreal cost.
these finished goods…
Hello,
I need to add an overhead cost on raw material used in a work order.
We use the AVC valuation method with a calculated cost.
Simple example: I need to add an overhead of 0.05$ per gram, based on the total Raw Mat 1 quantity ALLOCATED in…
Hi,
Pls. advise me how to setup the cost for FIFO parts ?
e.g below is my bill of material
Parent part is PART-01 - Valuation method is "STD" (Standard )
Component is COMP-01 - Valuation method is "FIF" (FIFO)
Component is COMP-01 - Valuation…