• Work Order Unit Time

    Hello, Can anyone tell me how the Unit Time on a Work Order is derived? Thanks n advance for any help you can lend!
  • Setup routing.

    looking for have routings setup per bottle instead of per minute. They want it to look like a WO done for 500 bottles with a routing of $1 each, will add $500 to the WO for labor. Is it possible?
  • Scheduling Method with Multiple Staged Routings

    Looking for a process to aid in scheduling a job with multiple routing 'prerequisite' steps. Example: Job ABC123 requires preheating prior to manufacturing and cooling post process. Routing 10 Preheat Routing 20 Manufacturing Routing 30…
  • Applying a change of standard operations/routings to firm and planned work orders

    Hi, We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…
  • How to get MRP Suggestions to use Routing Run Time and Purchase LT?

    MRP suggestions don't seem to incorporate Purchase LT as specified on Product-site records, and Run Time as specified in the corresponding Routing. Is there an overview or something that describes what affects this? It feels like things have been set…
  • Filter selection dialog when user click on magnifying glass icon

    I'd like to filter the selection dialog when user click on the magnifying glass icon or use ESC F12. In this case we need to filter the Routing codes of one article, the same functionality you see on 'Routings' Manufacturing > Technical data > Routings…
  • Routings scheduling graph

    Hello, I'm having difficulties with the graph generated in Routings, Scheduling tab then Graph button in the right menu. Even doth my operations are all absolute successor, the graph overlaps production time and doesn't represent the actual time lenght…
  • Keeping track of carts carrying product used in manufacturing

    My products when being produced are placed on a cart and that travels with them as they go work center to work center. we have a finite number of carts How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
  • I'm looking for a function to update Planned Work orders and Firm Work Orders with latest Routing information.

    As the subject says, i'm looking for the ability to upgrade existing *** and WOF with latest Routing information.