Is there a way to dynamically select the routing operation in the work order based on a component quantity in a BOM
e.g.
BOM A with a lot size of 2000kg have
Component X: 1500kg
Component Y: 450kg
Component Z: 50kg
BOM B with a lot size…
I'm trying to understand the relationship between these two fields, the MRP structure and the Work Center Structure.
The INFCAPSTR dates are never on Fridays, but the OPEEND has some Fridays.
the MRP structure has 10 hours on Fridays, but the work…