• Does MRP pegging only do suggested materials and not loads?

    Still a newbie here....
  • MRP Settings - Load Calculation and Production Lead Time

    MRP Settings have the load calculation at 26 weeks. The production lead time is set to Routing/Product Lead time From what I can see in the load graphs, I only see load for 6 months. and from the MRP results, I can see that the routing is used for…
  • "Inconsistent duration" message in MRP log

    What does this message mean when I see it in my MRP log? I believe it started after I changed some work center structures to be different than others. The raw WIP work centers are at a 15 hour capacity structure, and the finished goods work centers…