• committed cost-developer

    Report 6-1-12-51 Committed Cost-Developer. How does this report for Developer differ from regular reports? There are asterisks after some items, but no description of what the * means.
  • Sage Intelligent Reporting vs Liberty Reports

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…
  • Change Company name on reports Sage 300 CRE Accounting 20.0.1

    Hello, Recently we have moved from a publicly listed company to a limited liability one and looking to change the name on sage reports .
  • Estimating reports into Power BI

    Hello, I’m new to Sage and looking to access estimates through Power BI. I’ve connected through ODBC, but I do not see how to get estimate information, only Database information. any ideas?
  • Report Designer - Design Formula does not show up in Conditions

    Greetings, I am following the instructions of KB186526 to create a Date Prompt on a JC report. I am able to create the prompt fields. I can make the design formula (using Accounting Date [JC Transaction] instead of Accounting Date [GL Transaction…