• committed cost-developer

    Report 6-1-12-51 Committed Cost-Developer. How does this report for Developer differ from regular reports? There are asterisks after some items, but no description of what the * means.
  • Sage Intelligent Reporting vs Liberty Reports

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…
  • upgraded from 18.12 to 20.1 all report layouts show under layouts but they are all wrong

    We upgraded Estimating last night and now any report layout you choose the previous settings are gone