• committed cost-developer

    Report 6-1-12-51 Committed Cost-Developer. How does this report for Developer differ from regular reports? There are asterisks after some items, but no description of what the * means.
  • Sage Intelligent Reporting vs Liberty Reports

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…
  • MyAssistant - Job Cost Report - Report Designer

    I have a Job Cost Report that I run task and it will send out to each PM but includes one report with all of their jobs. How do I change the report conditions so it will send a separate PDF report for each job that only contains information for that one…
  • My Assistant one page pay statement

    We recently purchased MyAssistant and would like to send out a one page pay statement. We would like a one page statement similair to the Sage report attached to the pre-built task, "Send employees their pay statement (report attached)". I am not able…