• committed cost-developer

    Report 6-1-12-51 Committed Cost-Developer. How does this report for Developer differ from regular reports? There are asterisks after some items, but no description of what the * means.
  • Sage Intelligent Reporting vs Liberty Reports

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…
  • how is the labor burden calculated in the 6-1-2 reports?

    I am having a difficult time trying to figure out how the labor cost is being calculated on the 6-1-2, labor cost reports. they are varying highly for my designer. the same job had one days work at 31.80$ and another days at 75.20$, regular hours, not…