• Job Cost Commitment edits in AP

    We have a commitment entered. The vendor and job are tied to the commitment. We’ve been told by the help desk that there are no edits in an AP entry to prompt to add the commitment. SAGE suggested sticky notes or leaving the insurance out of the system…
  • Can I block or "Freeze" posting to a Job Cost Code or Extra?

    We have several jobs/contracts with allowance items, that once fulfilled we like to no longer have posting to that cost code or extra. Is there a way to block or at least get an error message that a particular cost code or extra on a particular job is…