• Migration From Sage Accpac ERP 5.3 with Pervasive 8 to Sage 300 ERP 2018 with SQL Server 2017

    I have a Sage Accpac ERP 5.3 using Pervasive 8 but we want to migrate to Sage 300 ERP 2018 using SQL Server 2017 someone knows the best way and best pratices to do it please
  • System Requirements for Sage 300

    We are upgrading to Sage 300 in a small environment aka 3 people. Or reseller is saying we need 32G RAM. The only document I found that might relate to this shows 3 deployment scenarios of Standard, Advanced and Premium. It doesn't elaborate as to what…
  • installation 2016 Server 2008

    We were really hoping to stick with a 2008 box for the Accpac install. Did we miss our window of using 2008 by a version or two or are we long done with those versions? We're also looking at the possibility of using server 2016. Is there any chance…
  • Not a valid Crystal Report

    After upgrading to Version 14.1, some of our systems will not print Crystal Reports. When attempting to print we get the following error message. We have attempted to perform the suggested Resolution on KB 55371 with no results. Anyone have any ideas…