Hi
I have never had a client ask me for this before and I possibly wrongly assumed it was possible.
I have turned Serial numbers and tried to enter a Job Related Purchase order for an Item that has serial numbers
I get the message below
If…
Hi,
Has anyone used a grid inventory management system (GIMS) to add items under materials in PJC?
Additionally, can you add PO's from GIMS to a project in PJC?
Thank you
I'm trying to figure out the WIP report in Sage. The report in PJC doesn't give me what I would consider to be a proper balance even when looking at the totals in the contract maintenance screen. My client and I have run this on live data and on the sample…
Hi
when activating applications to 2019, all modules activate but on PJC get the following l
Check Tables could not load view on the following PM0043, PM00114, PM0061, PM0065, PM0404, PM0301, PM0473.
Doing a direct upgrade from 6.0 PU1 to Sage…
hello ~
I am a user in sage 300 PJC.
In project and job costing, i want to print a report actual revenue monthly. but the "contract summary" program can only search accumulately. where can i print a report only one month?
thanks !
When i do a materials return in PJC it is using the Most recent cost instead of the Average cost set on that item. Is there something that am doing wrong or a setting that i should change in PJC?
Sage 300 2020
I've tested this and searched for a while online but can't seem to find anything solid to confirm. It appears that PJC data is dropped when generating a PO from SO. Am I missing anything? Is it possible to have Contract/Project/Category flow through to…
Anybody have any idea about the Sage 300 2018 PU4 PJC Performance? Sage300 v6.0 performance is fine but slow after upgraded to v6.5 PU4 (Sage 2018).
The PJC UI always become “Not Responding” (But NOT hang). The result will come out 5-10 mins for each…
We have been using ACCPAC since the DOS days, at least since I started in 1994.
Historically, we did a small amount of service and repair work, but the bulk of our business was distribution - simple in and out of product with no added value.
In the…
Hi,
I am having a question for the Project and Job Costing module.
For a Project, it does not allow billing to customers in different currencies.
However, in business world, it does happen.
Is there any workaround?
Thanks.
Cinny
We are new to the PJC module and when we started to setup the jobs, we ASSUMED that we could add the customer numbers later...i ASSUMED wrong. Now, i have these jobs loaded with transactions and was wondering if there is a way of opening up the job so…
I did the following
- At the contract level I set the Overhead type to Percentage of cost on a job
- set the % to 26.74
- entered and posted a cost and eq transaction
** I anticipated seeing my cost + 26.74% in my GL batch. I only see my cost…
Hi there,
Our client has an issue regarding job-related O/E Shipment.
After posing a job-related shipment, user noticed that unit price was wrongly entered.
As the shipment is job-related, any fields in this screen are not editable anymore.
Do…
Is it possible to add the tax portion of a PJC related Payroll check.
I have been able to add the job both in Timecard and Manual Check. I see the same column in Tax "Job Related" in the Payroll inquiry screen.But unable to figure out how to include…
Thanks in advance,
In the middle of December, we created a multiline purchase order that was job costed to roughly 25 identical jobs. Everything seemed fine until we viewed a job report for a completely unrelated job - the purchaser realized that a…
I've been asked if the PJC module can prevent the Rec of Cost Generation until the billing is done even of actual cost have been posted against that project.
Another way of saying it is: They want to make sure they are not recognizing the cost for projects…
Hi,
I will try my best to explain my problem.
I need to know, based on your experience, what would be the best way to handle Overtime cost coming from Canadian Payroll that needs to get transferred to Sage 300 ERP - PJC - contracts.
If I'm using…