• Accpac 5.5a

    Hi, we currently are using AccPac 5.5a version and we would like to see what options we have to move to newer versions. We run a small business and AccPac 5.5a is perfect for us but do realize its time to upgrade. Currently our systems run on Windows…
  • Database error (operation=REV-POST, error=229)

    We are using AccPacc to work with Sage 300. When we call View.Insert the error message appeared: ------------------------------------------------------------------------ Timecard Detail. Database error (operation=REV-POST, error=229) ------…
  • Importing Transactions into Project and Job Costing

    Hi, I am getting the below error message when i try and Import transactions into Costs under the PJC transactions. The Error mentions PM0420 which either has to do with Document Number or Line Number, but I am not able to resolve this error - Could…
  • Why after changing the flag on a AP batch to ready to post, transaction posted from PO keeps updating same batch ?

    We have configured our system to do all costing during posting. and with multiple departments using the PO module we'd like to set a AP batch as ready to post to avoid modification. Now what we have notice that even after setting AP batch as ready…
  • Current fiscal period for a company in database?

    Can someone please tell me what table/column will give me the current fiscal period for a company?
  • installation 2016 Server 2008

    We were really hoping to stick with a 2008 box for the Accpac install. Did we miss our window of using 2008 by a version or two or are we long done with those versions? We're also looking at the possibility of using server 2016. Is there any chance…
  • You must clear the returns and post bank reconciliation

    Hi, I am trying to upgrade from Sage Accpac 5.5 to Sage 2014. Right now, I am trying to upgrade to 5.5 to 5.6A. I was getting the following error message, " You must clear the returns and post bank reconciliation". I found the resolution and did the…