Browse By Tags

  • Error 11 Can anyone shed some light on how to correct?

    We have an user that is moving parts around on several bill of materials. He is consistently receiving this message. Often after the message is received the items behave oddly, such as not being able to delete or modify. When we try to delete or modify…
  • Application error when user do manufacturing

    My user is facing a challenge when he does manufacturing for one site only. It happens mostly when he enters multiple lines (more than 5). If he does the same for other sites or he does less than 5 lines they go through and also its not consistent sometimes…
  • Scrap Consumption and Tracking in X3

    Hi! Looking for some help and understand other practices. My operation uses back flushing for completing work orders but there is no scrap rate entered in the BOM. How do I manually add scrap when closing a work order, how do I separate scrap from…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Planner One notice: Your desktop is being initialized. Please wait until this action is complete.

    Hi all, While using planner one on SageX3 V12, our site is initialized and planner one opens perfectly, but after any WO is submitted we get this notice (making it unable to proceed) Did any of you guys face such an issue? TIA
  • How to limit memory usage of PlannerOne pool?

    Hi all, To the Planner One users, I'm sure you might have noticed PlannerOne Pool using up alot of memory. Currently using 35GB in my clients server. Anyway to limit this? This in turn is making the system very slow. Any advice on how you guys handled…
  • Lot Numbers

    I need to come up with a way to consume containers (what our product is packaged in) when a work order is closed. I have thought keeping the current BOMs for the "master BOM" (bulk BOM if you will) for each product and then doing a second BOM that puts…
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • Sage & Orion

    Hi Support, We are using Sage 300 ERP 6.0 for our group of 3 companies. At present, we have one application server and multiple DB's and Terminal server for other 2 companies. One of the sister companies will be implementing Orion POS in the near future…