• SMART Report - Multiperiod Costing

    Hi, I just ran my multiperiod costing report from SMART Reporting and although my selection period is 2022/02/01 to 2022/02/28 the report generates the dates as February 2023 in the summary columns and details tab. Anyone else having the same issue…
  • VIP SMART Reporting (Library Not Registered)

    Good Day City, I am getting the below error when running a report on SMART reports. The application can launch successfully but when you run a report, the error pops up; Resolutions attempted; Reinstalling the VIP Premier + SMART Reporting…
  • Bulk Leave Transactions

    Hi Please assist, I have last did this in 2017 and Totally stuck now as I cannot remember all the steps on how to create the smart report template for leave import. I can remember a bit of creating the batch, on VIP, then there is a report on smart…