• Allow user to change their own password.

    Using BCEM v11 patch 10. Users are assigned the USER security profile. The User Menu Profile has been created with the Usage > Users > Password Change. (MTDI > MUSER > PASSE) Functional Profile is set to the User Menu Profile, and PASSE added to this…
  • Integration with MS Office: The object does not accept the property or the 'getLanguage' method // El objeto no acepta la propiedad o el método 'getLanguage'

    Hi There, I am trying to integrate Sage x3 v12 with MS Office, and I am facing the error below, when setup the datasource: Cannot read property 'shortDate' of null --------------------------------------------------------------------------------------…
  • V12 Personalization and Menu Import

    Hello, I'm working on publishing the X3 folder for V12 and I'm at the stage where I need to run the Personalization and Menu Import. When I run it, it fails very quickly with this error. Has anyone seen this before?
  • production planning

    I am more familiar with SAP. How exactly is a Supply Network Plan created in SAGE to get to the point where you can create the Master Production schedules?
  • Routes with long operation times set up

    Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
  • Attach pictures to sales invoice - several pictures at once.

    Hi there, I have been attaching images in sales invoices in the Attachment section of the Invoice record, it takes time to do but in the long run when we have more images then one. Question: When attaching the Images I have to do them one at a time…
  • WIP unbalanced journal

    Hi, on Sage X3 v11, we are getting an error when posting the WIP of unbalanced journal all the accounting codes are setup correctly. we've even put a default GL account on the chart of accounts to post to that account in case we've missed any important…
  • Work center resources

    If my work center is set up as a machine, is the # of resources the: # of machines or the number of people to run the machine ?
  • Detail Scheduling Products with similar components

    Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
  • RCCP in X3

    Does anyone have a blurb or training guide on RCCP and it's relationship to WO scheduling in X3 ?
  • Error on Setup > User - Pilot FOLDER

    Hello all, When I am in the PILOT folder trying to access Setup> Users, "GESAUS" function, the system presents this error: Error only on PILOT folder. I'm using Admin user, this started happening after validating the menu in the function…
  • Routings scheduling graph

    Hello, I'm having difficulties with the graph generated in Routings, Scheduling tab then Graph button in the right menu. Even doth my operations are all absolute successor, the graph overlaps production time and doesn't represent the actual time lenght…
  • HOW BEST TO SETUP CHART OF ACCOUNT

    I have a serious challenge in determining the best approach to this issue. A group called T has 3 sub groups called I,S,H respectively and they are into 3 different types of business.(advertising,security and digital board sales). Sub group I has…
  • What is a business use case for Phantom products and Phantom product boms?

    I have not been able to find a lot of training on this topic. The documentation makes mention of it, but I'm curious what "real world" uses there are for phantom products, and boms that are associated to phantom products.
  • Manufacturing: machine set up optimizing

    Hello, everyone! We are facing an issue during the production scheduler implementation. The customer uses products characteristics to optimize the set-up time. Let’s say it is 5 hours long for a complete machine set-up, then to change from a product…
  • Keeping track of carts carrying product used in manufacturing

    My products when being produced are placed on a cart and that travels with them as they go work center to work center. we have a finite number of carts How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
  • Automatic Journal STKUV - Lines 3 and 4 (Stock increase/Stock increase adjustment)

    Hi Everyone, The Automatic Journal STKUV - No Absorbed Value after update Lines 3 and 4 (Stock increase/Stock increase adjustment) generate journals with zero debit/credit amount. STKUV Automatic journal Line 3 Stock increase Condition: func AFNC…
  • Assembly Manufacturing

    We would to setup a client that does assemblies to use manufacturing functions like work orders orders and routings at the same having the ability to dissamble any of the parts at a latter time if the customer returns the product for warranty servicing…
  • Work Center Utilization and Status?

    Hi there, I'm using X3 v.9. I was wondering if there was a feature or a modification where a work center can be put into a certain status.... like "repair" or "conversion"? So that we can track how much the station is being used. Thanks!
  • How to Setup and Test Web services in PU8 patch level 2

    I have published the Web Services in the X3 Console and added the folders but keep getting an error when testing that " BLOK,Entry alias[LIVE] not found in connection pool" Where can I set up the Alias or test it. In V6, I was able to go to Dev->Util…
  • How do I fix SEI connection issues?

    FormerMember
    FormerMember
    Users from one of are remote company locations can get to the https login page via the WAN and enter their AD credentials. Once the credentials are provided SEI never moves past the connecting screen. We are using AD authentication and the users who are…
  • Date Format v7/PU8 for Reports

    Changing the Locale setting's Regional Preferences from en-US to en-GB for example correctly displays the UK date format online - but reports still display the date in en-US format. Question: how to have UK user's reports print using the en-GB (d/m…