- The client assembles goods.
- The Bill of Materials can go up to 5 levels deeps
- Each component on the BOM is tracked by a serial number
- When the finished product is sold to client it will be under warranty.
- Scenario happens that a component malfunctions for example component E below. They would like to be able bring the MAIN component back for servicing and component E (SN20015) and replace with E (SN20017)
- What is the best way in Sage X3 to handle the replacement (swap)?
- When the component E (SN20015) has been removed it will then be refurbished and can then be used in another MAIN product (SN13900) to be assembled in the future.
- We will need to track that this component has been used on MAIN (SN12900) and was found with issues and was refurbished and now is in MAIN (SN13900). How can we have a clear audit trail and reporting of these serial movements in Sage X3.
- All the quality and non-conformities need to be tracked in Sage X3
- Is there a way we can use the disassemble functionality for manufactured goods. Their type of manufacturing is Assembly Manufacturing where the raw materials are just assembled together and can be disassembled. Need to use manufacturing functions work orders, routings, work centres, scheduling and tracking.