• 2-6-0-21 Check Register Report

    Can anyone advise on what the "*" means next to the date on the Check Register Report 2-6-0-21 ? Thanks for your help in advance!
  • Voided A/P Checks

    I just voided several checks for a vendor. How do I run a voided check report?
  • Sage Intelligent Reporting vs Liberty Reports

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…