• Write Over Contract Value in Job Master from Office Connector

    It doesn't look like there is an ability to use the Write function to update the Original Contract Amount in the JC Job (1) Master table from Office Connector. Is this something that we are able to add in? We would like to keep this field updated for…
  • Accessing Sage 100 Contractor 2016 Database with Microsoft Access 2010

    How can the Sage 100 Contractor 2016 (version 20.4.51.0 or greater) databases be accessed using Microsoft Access 2010? I would like to link to the data source by creating a linked table. To do this I have created a Machine Data Source using ODBC in…