• Can Equipment Type be Changed?

    I recently started with a company that has been on the platform since it was Peachtree/Master Builder and am investigating the best way to change data. The equipment module has 97 pieces of various real world types of equipment assigned to 30 system types…
  • Vehicles in Equipment Module

    Setting up new company and in the process of uploading company vehicles and equipment. The company has numerous pieces of construction equipment as well as multiple vehicles. Within the "Equipment Module" is there a method for specifying whether the item…
  • Tracking Meter Readings in Sage 300 CRE 15.1

    I'm trying to set up Equipment to monitor service records for our equipment - primarily oil changes. When I use the Meter/Odometer it just overwrites the last entry. I need to see Equip/Date of Last Service/Mileage(Meter reading) at last service/Current…
  • Estimator / Project Manager Position

    South Bay Landscape Company is currently seeking a qualified Special Projects Estimator/Project Manager to join our team. This position requires an understanding of the complete bidding process of landscape installation or renovation of projects along…
  • Equipment Module Info?

    Aloha, Where can I find information on the Equipment Module? http://sage100contractorhelp.sagecre.com/help/Sage100Contractor/US/19_2/Content/Welcome_to_Sage_100_Contractor/Sage_100_Contractor_Add-on_Modules.htm has a link but it's dead and no one…
  • Remote Time Entry/Outsource Payroll

    We're moving to HH2 for remote time entry and eventually ADP for payroll processing. Right now, we have our equipment allocations applied through payroll. Curious if any others have made this move and how processing your equipment allocations have changed…
  • EQ Cost distribution in Job cost codes

    FormerMember
    FormerMember
    Equiment Cost Module. We are collecting the cost for the EQ in AP, JC and PR for each EQ at the end of the month we have all of our cost entered and posted to a EQ cost code, and we do have an EQ timesheet where we have the hours that the EQ has worked…