When modifying a report, there is an option to enable 'or' logic in the selection criteria. I'm having a hard time setting this up and wanted to see if anyone has had success with this.
Hello All,
We use the Union Paygroup Report (5-1-7-31) in Sage 100 Contractor to pull information for our monthly union remittance. This report can only be run by period end or check date. I'm looking for a way to run it for the entire month (i.e. 1st…
I am having a difficult time trying to figure out how the labor cost is being calculated on the 6-1-2, labor cost reports. they are varying highly for my designer. the same job had one days work at 31.80$ and another days at 75.20$, regular hours, not…
I need to modify the 5-1-8-41 report (and name it 5-1-8-05) with the following modifications:
* Remove PREMIUM hours column and replace with OTHER hours column (to include sick, vaca, holiday as we don't use premium)
* Add OVERTIME WAGE column
…