• how is the labor burden calculated in the 6-1-2 reports?

    I am having a difficult time trying to figure out how the labor cost is being calculated on the 6-1-2, labor cost reports. they are varying highly for my designer. the same job had one days work at 31.80$ and another days at 75.20$, regular hours, not…
  • Report error: "Index was out of range. Must be non-negative and less than the size of the collection"

    Reports starting giving the following error: "Index was out of range. Must be non-negative and less than the size of the collection. Parameter name:index". This just started happening on the latest update. I've been using these same reports for years…