• Work Orders

    Hi Team, I would like to understand the difference and impact between using a *** (Work Order Planned) and a WOF with status 'Planned'. Thanks
  • Labor Entry posting for the entire shift

    We have an issue with a product line, and we can't seem to correct it. On 90% of our routings for manufactured products, when we do a Labor Entry it calculates Overhead and Fixed costs using the pieces per hour and work center rates. One one product…
  • Sage 500 ERP - Advanced Planning and Scheduling - Module Documentation Available?

    Hello Everyone, We are currently demoing the Sage 500 ERP Advanced Planning and Scheduling module with the hopes of implementing it to help us with manufacturing capacity planning. Would anyone happen to have actual documentation for the module? Our…
  • Is there a way to print labels from progress step in manufacturing?

    I would like to print a label when I'm entering my final labor entry step. We currently have a custom report we use to print labels after the fact, but it would be great if it was included as part of the progress step. This feature would also be great…