• Need support for quarterly and year end closings. Sage 100 with Job Cost

    We are network cabling contractors using Sage 100 with Job Cost and lost our Sage 100 support person. We have a CPA, but need someone for quarterly/year end closings. Located in Orange County, CA near John Wayne Airport. Any referrals would be appreciated…
  • Job Billing Data Entry

    In Sage 100 Job Cost We are trying to bill a customer for unbilled time and material. This is an ongoing job and this is the second time we have invoiced this job. The first time we billed with no issues. We go to the job billing data entery window and…
  • Over total cost customer will pay in T&M invoicing.. do I mark job costs non billable?

    FormerMember
    FormerMember
    I am super fresh when it comes to Sage 100. I am learning as I go along. I have been doing T&M invoicing. Most recently we have a job that was not to exceed a certain amount and we are over on customer cost. From what I can tell I can mark job costs as…
  • Billing Methods for Jobs

    Using Sage 100c 2018 with Job Cost: What is the best way to invoice/bill for Jobs (through AR/SO/orJC), and what are the advantages or limitations of each method especially as they relate to WIP reporting? We use Milestone Billing (X% at time of order…
  • Time and Material wage rate calculation does not match what it should for wage rates set up for jobs T&M.

    How do you get them to match without manually changing the cost on each employees T&M billing (6-3). I have set up wage and material rates for this project, and set up the billing. After calculating, the material cost, and subcontractor costs match, however…