• Incorrect cost on closed work order

    We created a work order for a part number and accidentally put the unit cost in as $1,486.4667 instead of $14.8429. The work order is closed and inventory is overstated. Help!
  • WO Printing - Traveler Printing all WO's

    Sage 100c Advanced 2018 (Version 6.00.10.0) I have modified a Work Order Traveler form. I needed to add a conditional text field. No problem Now, back in Sage, when we print the WO Traveler, it prints ALL travelers, even though I have a selection With…
  • Work Order Labor Transaction

    Hi, We have a few Work Orders with issue method set to Automatic (We normally use Backflush). The Release transaction was processed, but no labor transactions were generated. My question: What could be causing this to occur? This hasn't happened…
  • Routing Change after Work Order created

    HI, I have noted that if you change routing for a BOM but a Work Order was already created, the work order doesn't see the change. I noted that with some Backflushed Work Orders, the Backflushed totals matched the old routing not the new. I just…
  • Intracompany transactions

    Hello, I am very familiar on how to post intercompany transactions but not with intracompany. I am hoping someone can assist me. My business for privacy is called ABC. ABC has 3 locations, WV, KY, TN. We utilize the WO module to purchasing, including…
  • Work Order transaction error - missing Material Issue within completion

    Morning all, A user was Completing a WO and accidentally deleted the Material Issue step within the WO closure procedure The WO is now ‘stuck’ as I can’t delete it due to errors that I believe related to the Material Issue (or lack thereof..) Please…
  • How do I print a Work Order Traveler in SAGE 100

    I know this is a basic question...But I at a lost. We create about 100 Work Orders a day and we have a ODCB connection in order to print our travelers. However, when I try to print the travels directly from SAGE it tells me there is no traveler to…
  • Work Order creating additional steps such as 100-B-500 etc.

    Good morning. I have created some routings which have 5 key steps to them for 5 key phases of manufacture to improve visibility. I have made these steps standardized across routings. The step numbers are set off by 100s so there is a step 0100, 0200…
  • Different Defaults for Different Users

    Is it possible to have different Default values for the Work Order Issue Method for different users in Sage 100? We have a situation where one plant is using the MANUAL issue method and another plant is using BACKFLUSH as the preferred issue method. Is…
  • Ability to make to order

    We are on SQL and light manufacturer. Need the ability to make to order. What have other companies utilized?