• What module would be best for new services?

    We currently use all the core modules (GL, AP, AR, BR, PR, IM, PO, plus Job Cost and Time Card. I am looking for something, for example - we may have 1-3 jobs at a time (up to 90 days each), each job will have 2-3 work tickets, and each work ticket generates…
  • Work Order creating additional steps such as 100-B-500 etc.

    Good morning. I have created some routings which have 5 key steps to them for 5 key phases of manufacture to improve visibility. I have made these steps standardized across routings. The step numbers are set off by 100s so there is a step 0100, 0200…
  • Mix Issue Methods - Manual and Backflush

    Hi there, Does anybody know if it's possible to mix issue methods in Work Orders? We have some Bills of Materials which are quite lengthy with expensive, lot/serial controlled components that we need to manually allocate. Mixed into the BoMs are a bunch…
  • Outside Processing onto Work Orders

    FormerMember
    FormerMember
    Hi everyone, We are having an issue making a connection between an outside processing PO and the work order.This is what we are currently doing: (1) Make a sales order for part Y (which is part X plus an outside vendor processing step (i.e. painting…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…