Browse By Tags

  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • ASYRWRKSIG Workflow approval link Error:

    Hi All, Please assist as to what might be a solution to the following error for workflow approval links: {"$diagnoses":[{"$severity":"error", "$message": "X3 engine error: D:\\Sage\\X3APP\\Folders\\X3\\TRT\\ASYRWRKSIG.src : File Non-existent ()…
  • Workflow Rule - Operations

    Good afternoon Folks Does anyone have a good guide to what the operations all mean? I'm trying to have this send 30 days before the date in the field, but I dont think create or modify will work for an even like this.
  • Routings - Copy Routings

    I'm updating BOMs to including a packaging code. I can copy the BOM from the original product by entering the new product code however the BOM routings are not automatically copied over. Is there a way that routings can also be copied over?
  • What are the steps and documentation required for a post implementation support of a SAGE X3 ERP?

    Hello Guys, I am just a newbie here in this forum and hoping to get along with you all. Moreover, I am about to support a newly implemented ERP system in-house through a post implementation phase and am just wondering what are the proper steps and…
  • WORKFLOW/NOTIFICATION

    Hi, Can someone provide step by step on setting up workflow or notification in sagex3. I looked online and could not find anything. I just want to start from the basic like a PO is created, it needs to be approved before it is posted/finalized. Or…
  • Workflow Question = Production Tracking

    Hello, I have a question with workflow. Basically, I'm trying to set up a workflow in the event that the amount tracked from the MTK object is either 5% above or below the expected quantity. Ex. If 36 units are expected, and only 30 are made (80%),…