Browse By Tags

  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Lot Numbers

    I need to come up with a way to consume containers (what our product is packaged in) when a work order is closed. I have thought keeping the current BOMs for the "master BOM" (bulk BOM if you will) for each product and then doing a second BOM that puts…