I'm looking for ideas as to the best way to consume packaging in work orders.
We sell products in various packaging....totes, drums, pails, etc.
Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
Hello,
We are upgrading the system from version 11 to version 12.We referred easy upgrade http://online-help.sageerpx3.com/erp/12/public/getting-started_quick-upgrade-guide.html link for upgrade process. The architecture of the system is multi-tier…
Is there a way to disable the forcing of capital letters in the PO no. field within order entry?
We have a partner who sends us PO numbers that contain both capital and lowercase letters.
When we transmit through EDI back to them the information is…
Hi all,
The assets are created through Purchase invoices where the expense and a partial VAT is posted in the same FA account.
For example:
However, this full amount is not considered in the expense:
In order to solve the amount that is…
I have a production BOM where I have the same component listed three times.
1. amount of "goop" that is needed to fill the containers for the finished good
2. amount of "extra goop" that is needed to prime the tooling
3. the same "extra goop" to…
I have a planned WO that was manually created on 6/3 that was manually created
stock went below the safety stock limit on 5/15
my MRP replanning messages have a 120 backword and foreward lead time, and under "replan dates" it's set to "Early"
…
I have Sage 50 Canadian Accountant company file and following setting are configured in it.
HST tax name is setup
Tax code H is setup and mapped to HST Tax name
For Receivable accounts , Tax code H is setup for new customers sales
…
MRP Settings have the load calculation at 26 weeks.
The production lead time is set to Routing/Product Lead time
From what I can see in the load graphs, I only see load for 6 months.
and from the MRP results, I can see that the routing is used for…
Does anyone have a better definition of the demand horizon than what has been in the training material ?
Also does anyone know what the affects of having the demand horizon set to 0 means for a manufactured good?
Thank you!
Using BCEM v11 patch 10.
Users are assigned the USER security profile. The User Menu Profile has been created with the Usage > Users > Password Change. (MTDI > MUSER > PASSE)
Functional Profile is set to the User Menu Profile, and PASSE added to this…
Hi There, I am trying to integrate Sage x3 v12 with MS Office, and I am facing the error below, when setup the datasource: Cannot read property 'shortDate' of null --------------------------------------------------------------------------------------…
Hello,
I'm working on publishing the X3 folder for V12 and I'm at the stage where I need to run the Personalization and Menu Import. When I run it, it fails very quickly with this error.
Has anyone seen this before?
Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
Hi there, I have been attaching images in sales invoices in the Attachment section of the Invoice record, it takes time to do but in the long run when we have more images then one.
Question: When attaching the Images I have to do them one at a time…
Can someone provide more of a guidance to the backflushing feature when it occurs in work order closing?
at what point does it trigger the new stock transaction to consume the "remaining" quantity of the components?
outside of the product-site record…
Do I need to create an alternate routing for every type of work center replacement configuration ?
for example:
if my routing alt 1 calls for work center A
and I set a replacement for work center A to be work center Z and run the optimization function…
Is this feature used to group work centers together (as if they were connected with a conveyor system) so that the scheduling tool doesn't replace one work center with another, and also keeps the schedule together (split the work order across a couple…
Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
Looking through the training material for MRP, most of the suggestions have the daily bucket set to 30. What are the consequences of having it set to 0 ?
When I look farther out in my projected stock inquiry, the WOS suggestions do not seem to be suggesting to build the stock to safety stock, but just a reflection of the demand. What settings influence this behavior ? How can I ensure my stock level is…
In the product-site record there is a demand horizon.
From my understanding, anything before that time MRP considers Firm SOs and anything after is Firm SOs and Forecast Demand. For me this makes sense for the products that are manufactured
What…
After I turn on the WRH activity code, it allowed us to create a warehouse under our site.
My question though, is do I have to create all new location numbers to be under that warehouse, or can I update the existing location numbers with a warehouse…