Project costing reports, is there a way to have a report set up that will exclude certain cost codes?

SUGGESTED

Hi,

We run projects through Sage and our project manager likes to receive reports with the cost codes with detail, we have set up a report for this.

However he has said he wants to continue using the existing report but with two of the costs excluded. 

I have tried playing in report designer but it seems to me that Sage will only ever pick up data such as COST CODE, you can seem to edit the collecting of this data from the program to exclude certain codes. 

I'm guessing the answer would be to set up a duplicate project and move these costs into that but the Project Manager would want all of the costs to remain in the project but only to be excluded from the report we run for him, so this isn't really the answer.

I hope this makes some sort of sense!

Thank you

  • 0
    SUGGESTED

    Hi Martin,

    Thanks for using Sage City.

    It is a possibility that certain cost codes can be filtered out of a project report, this could be done by either a filter or a report criteria. We would need to take a look at the report before we can be 100% certain this is a possibility.

    If you can give the report design team a call on 0191 479 5955, they can take a look at the report via remote support and decide then if a report design request could be raised for the changes you require.

    If this has answered your question please click More > Verify Answer.

    Kind regards,

    Sean,
    Sage UKI