"Updating Job Cost Phase" Database From Estimate

SOLVED

I have updated few "JC phase"  items in the estimate and then tried to update these item in "DATA Base" with utilizing

"

I have gone through all steps from inserting "Update DB" col and check make the items and also followed all steps after.

But, after all passing commands, Sage can't updated as planned and get the message "No Differences"

I am sure the items are not same as in the database.

is there anyone has the same issue/experience ? (if) Where I gone wrong? I am using Sage 20.1.2010.063 ver