• Work Order Adjustments

    FormerMember
    FormerMember
    In Sage 100c Advanced 2016, Updated a completion step of Work Order. Some items posted to scrap with all the cost and some items posted to inventory with no cost. Somehow the cost was all posted to scrap. Now if we complete other steps in the Work Order…
  • Next Work Order Number

    I am trying to create a VI job to import work orders. The job works fine, but there does not appear to be the option to use the next available work order number., the "Next Assign" feature is not available. Does anyone know how I can auto assign the next…
  • Outside Processing onto Work Orders

    FormerMember
    FormerMember
    Hi everyone, We are having an issue making a connection between an outside processing PO and the work order.This is what we are currently doing: (1) Make a sales order for part Y (which is part X plus an outside vendor processing step (i.e. painting…
  • Any ideas how to import data for the Work Order module to record material issues with Lot/Serial Number Distribution

    I am able to import records into the WOS and WOU files individually through visual integrator, but the issue I am having is how to determine the Line Index for the WOU file. I can get the index from the WOS file after I import it in, but I would like…
  • Work Order Module Compatibility

    Hi all, We're still on SAGE 2014, primarily because of our ERP team saying that the work order module that we have isn't compatible with newer versions up to and including 2018. Work order is a top priority for us now. However. SAGE has ended mainstream…
  • VI Job for Work Orders

    Started working at a new company that manufactures equipment and they are wanting to implement Work Orders for their jobs. Due to the increase of data entry etc, they have me looking at importing Work Orders instead of manually creating them. We utilize…
  • JobPack Production Scheduling software

    We are currently evaluating a third-party solution called JobPack Production Scheduling for a client of ours who uses the Work Order module. Is anyone currently using this software? Has anyone heard anything about it? Any thoughts on this enhancement…
  • Editing Work Order Module Reports

    I am trying to find the RPT file to edit for my Operation Code Listing that I am accessing through Work Order>Setup>Operation Code Maintenance>Click on printer icon. I have had mixed luck being able to edit the reports from the work order module, some…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
  • Work Order VI Import - Validate Routing Number

    Sage Erp 100 2014 Does anyone know how a VI job for work order can validate that the Routing number being imported already exists in the Routing Maintenance file and fails if it does not exist? Thank you in advance.
  • WO reports not opening

    Hi, Our accounting manager suddenly can't open the On Demand Cost Ledger report or the On Demand Variance from Std Report. There's no error message--an icon for the new window appears briefly in the task bar, and then disappears almost immediately.…
  • Work Order - Cost adjustments for Materials - Sage Mas90 v4.5

    Once the material transactions have been posted, is there a way to adjust the material cost and not the quantity? Some inventory items were received incorrectly. Inventory trxns were created to fix the cost, but in that time, transactions were posted…