Job Billing not pulling the correct Material Cost

We recently switched from Sage 50 to Sage 100. Job Billing Data Entry is supposed to be pulling in the material cost and adding our Markup but it doesn't pull the correct cost. On one job our Material Cost was $38.00 and it pulled in $88.00. Any idea why it is $50.00 off?

Thanks!