Stock consumption related to a project in PJM

Sage X3 is an integrated behemoth consisting of various modules that use each other's functionalities. In other words, to consume stock for example in a the project module, the already available stock consumption functionality in the stock and distribution modules is used by linking the movements to the project tasks. There are no new ways in PJM to consume stock.

  1. For a manufacturing project, work order tracking will consume raw materials bought for the project.
  2. Products bought for a project can be sold and shipped/delivered and thus be consumed from the project.
  3. But if not doing manufacturing, or shipment/deliveries, miscellaneous issue is appropriate.
  • There is non-billable deliveries now available and thus I think deliveries could work even much better and gives control in terms of documentation, allocation and delivery form to the customer.