• Can production tracking be reversed?

    Hi, I am having issues when it comes to Production Tracking and WO Closing. Here are the issues: 1. One of the materials in my BOM was discontinued but production already tracked all materials. Since it is discontinued, there was no stock of that…
  • Changing Dimension Number without Losing Financial Data

    Does anyone know if we're able to edit the dimension/asset number without losing our financials on that asset? IE changing #13022 to #13049, but keeping all associated records. When we go into the dimension to change the established number now, it simply…
  • Applying a change of standard operations/routings to firm and planned work orders

    Hi, We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…
  • Allow recursive BOM

    Is it possible to allow recursive Boms? In another mean Have the output item the same as input item. thanks
  • Adjust cost of finished goods after WO closed and costed

    Hi, On Sage EM v11. we have a case where the users have created a WO, tracked it but did not track the labor time. They then completed, closed and costed the WO. which resulted in getting finished goods but with unreal cost. these finished goods…
  • Stock Valuation Method Change

    FormerMember
    FormerMember
    Good afternoon, Has anyone made a change to the stock valuation method after initial go live? We have a customer who has been live for almost a year now, and they want to change from FIFO to Standard cost valuation. Has anyone had experience with…