I am working to export my data from Sage Timeslips 2017 to LEDES1998 format. In doing so, I see that the Timeslips Task Code field corresponds to the Line Item Activity Code in LEDES and the Timeslips Reference code corresponds to the Line Item Task Code field in LEDES. I am not able to associate the Timeslips Task Code field to the Line Item Task Code Field in LEDES. The Timeslips Task Code field is where all of my task codes are stored. Is there a reason why the LEDES format does not allow for the association of the Timeslips Task Code field with the Line Item Task Code in LEDES? If there is a way to make that change, what is the process for that. Thanks for any assistance you can provide.