• Planning work order material import for BOM change

    What is the best way to update planning work order material based on the updated BOM? There is no standard import template for MFGMAT. Users requested that they have three old components that is in 189 open work orders that "builds" phantom part# to…
  • Preparation time PRPTIME not working on weekends

    I found a problem in X3, i don't know if it is related to PARAMETERS or bug... In our company we have preparation time setted in all operations representing the "Transportation time" in each operation. Normally we have 2 days in preparation time and…
  • Importing new components to existing BOMs

    I would like to add additional costing components to existing product BOMs in Sage X3 (v11). When using the import template BOMPD, it requires a field for the BOM component sequence (BOMSEQ), however, each BOM has a different number of existing components…
  • What is the purpose of the following: Substitution product "Field SBSITM / Screen ITS [ITS]" VS Alternate product "Field RPLITM / Screen ITM2 [ITM2]" in "Product"

    Hello All, Can someone explain the reason for these two fields listed in the subject in "Products" screen. I've read the basic break down's from "F1" help, but we are looking for more real world examples and purposes of these two fields. Could either…
  • Manufactured product - Q status as default single item

    How do you have a single product be put in Q status as soon as a case / pallet is made in production? I can see how to do it by "product category" but i only want a single item within that category. Sage X3
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • Manufacturing: machine set up optimizing

    Hello, everyone! We are facing an issue during the production scheduler implementation. The customer uses products characteristics to optimize the set-up time. Let’s say it is 5 hours long for a complete machine set-up, then to change from a product…