• What is the purpose of the following: Substitution product "Field SBSITM / Screen ITS [ITS]" VS Alternate product "Field RPLITM / Screen ITM2 [ITM2]" in "Product"

    Hello All, Can someone explain the reason for these two fields listed in the subject in "Products" screen. I've read the basic break down's from "F1" help, but we are looking for more real world examples and purposes of these two fields. Could either…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Trolley Build Function Sage

    I am wondering if anyone out here has had any experience with the trolley build features with Datalinx? We are thinking of exploring "picking to slot", "Trolley Build", "picking to Carton" functions in our warehouse. Would love to pick someone's brain…
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • Planner One notice: Your desktop is being initialized. Please wait until this action is complete.

    Hi all, While using planner one on SageX3 V12, our site is initialized and planner one opens perfectly, but after any WO is submitted we get this notice (making it unable to proceed) Did any of you guys face such an issue? TIA
  • Lot Numbers

    I need to come up with a way to consume containers (what our product is packaged in) when a work order is closed. I have thought keeping the current BOMs for the "master BOM" (bulk BOM if you will) for each product and then doing a second BOM that puts…
  • Screen related info

    We are creating a customized report for manufacturing. There is a particular field on the Routing screen (Graph>Show list) This displays the Start date which is displayed for the particular operation in date/time format. However we are unable to find…
  • 6 Steps to Generate an Order using Project Management and MRP

    6 Steps to Generate an Order using Project Management and MRP You know how excited I am to detail how to combine PJM and MRP to generate an order? Let's get started... Note: For urgent items, or items with a long lead time purchase orders (PO), work…
  • Packaging Consumption in Work Orders

    I'm looking for ideas as to the best way to consume packaging in work orders. We sell products in various packaging....totes, drums, pails, etc. Currently the packaging is relieved from inventory at time of sales invoicing.....packaging codes are…
  • Sage X3 (Not the Sage HRMS module) integration with SAP SuccessFactors

    FormerMember
    FormerMember
    Has anyone had a need to integrate Sage X3 with SuccessFactors? May you give specific usage scenarios where Sage X3 will need to interact with SuccessFactors please? Example is the need by Sage to use the org structure for approvals and for POs. Thanks…
  • Filter selection dialog when user click on magnifying glass icon

    I'd like to filter the selection dialog when user click on the magnifying glass icon or use ESC F12. In this case we need to filter the Routing codes of one article, the same functionality you see on 'Routings' Manufacturing > Technical data > Routings…
  • Routings scheduling graph

    Hello, I'm having difficulties with the graph generated in Routings, Scheduling tab then Graph button in the right menu. Even doth my operations are all absolute successor, the graph overlaps production time and doesn't represent the actual time lenght…