• Subcontractor List

    How do I create a report that will show me a summary balance total paid to a Vendor/Subcontractor in a specific time period ?
  • Commonwealth of MA DLS Weekly Certified Payroll Report and Workforce Participation Form

    Hello Sage CRE community: Wondering if anyone out there has a custom report design they can share for this weekly reporting...?
  • Progress Billing-Line Item Description is too short

    I am in menu 3-7, and am unable to see the complete description of the Line item when the continuation sheet is printed. We have a very particular client that needs everything spelled out and nothing abbreviated and therefore need the entire description…
  • Voided A/P Checks

    I just voided several checks for a vendor. How do I run a voided check report?
  • External dashboards with Sage 100 Contractor?

    I am running Sage 100 Contractor and looking for an external dashboarding program that links into Sage 100 Contractor and pulls data automatically to update screens around the office. Anyone doing anything like that with Sage 100?
  • Sage 100 "sub" cost codes for General Ledger and for job costs.

    Hello! looking to find out if Sage 100 contractor has the ability to create sub cost codes for the general ledger accounts (we need to break out further but accounting at a high level does not want this level of detail) At a job level, we have about…
  • T&M reports

    I have a large project I am billing T&M. I've been pulling reports from 6/1/4 thinking they would be the same as the T&M summary or journal. Turns out there is a difference. Can anyone tell me why these reports would not pull the same for costs? And which…
  • Can someone give functionality, ease of use and pricing comparisons between Sage Intelligence and Libery reports when working with/from Sage 100 Contractor- Thanks

    I am a long time user of Sage 100 Contractor (formerly Master Builder). I need more flexibility in data reporting from the system. I have read that Sage Intelligence Reporting and Liberty Reports are two add-in options. If you have experience with either…
  • Tracking VPO's

    I am looking for an efficient way to track VPO's on individual jobs and pull reports on many jobs to see where the overages are in the budget based on Variance purchase orders. For example if our company is spending alot of money on trucking over and…
  • EEO Component 2 reporting isn't taking into account people that did not get paid during that period.

    The EEO-2 reporting task (found @ https://www.sagecity.com/support_communities/sage_construction_and_real_estate/f/sage-cre-announcements-news-and-tips/132885/sage-300-cre-us-payroll-update-for-eeo-1-component-2-reporting ) isn't taking into account people…