• Job Numbers & Cost Codes

    We use AL Mobile for timesheet entry. When jobs and cost codes are entered in Job Cost, they are imported into AL Mobile at regular times during the day. If they are set to unstarted, they aren't imported; I manually change the status to "in progress…
  • JTD Costs have not hit on specific Job

    Hello, I pulled an Over/Under and realized that on a specific job the JTD costs are not showing. We were billed and already paid the intercompany for their portion of the project (through TimberScan), but JTD costs isn't reflecting this. I already confirmed…
  • How can I tell if I have billed retainage

    1. I m looking to see if there is a report that would show me if i have billed retaiange. 2. I m looking for a report or something that i can run that would show if I billed for my jobs that month.
  • Cost code with their own Extras

    Hello, We have a division project that caters to small projects. We are thinking if it's possible on the job cost to have Extras for the cost code. Is anyone knows or did that before? Your suggestions will be highly appreciated! Thanks!
  • Subcontractor and Tier 2 Diversity Spend

    We are getting more requirements from our Owners to formally report our Tier 1 and Tier 2 Diversity spend. We have all of our subcontractors set up in Procore with their diversity status but it looks like getting the spend report out of there is not going…
  • Job Cost Accounting & Closing Cancelled Contracts

    Hello World! We are a mid-sized business and are using Sage 300 CRE 17.1 rev. 7. In the contracts module, how do I close out a contract when the contract is cancelled and we have already posted the necessary refunds to the contract? We're of course…
  • Imported Estimate to Job Cost: Need Job and Date

    Hi, I need to be able to know What Jobs had estimate total simported into Job Cost and posted. The data I am seeking is how many estimates by location my team generated. Each Job is named by location, So I have that data. However, I can not figure…
  • Sage 300 CRE Integration

    I want to do integration with Sage 300 CRE. But I don't know where to start with. Please share if there is any link for SDK. How can I do integration with this ERP? I want to create Job Cost in ERP using my program. Please help.
  • Have you ever had payroll post to an incorrect job and wanted to fix it without using payroll?

    It is a common issue that payroll checks get posted with incorrect job information that needs to be corrected in Job Cost. We usually recommend voiding the check or using Change Posted Time in payroll, but sometimes that is not an option for you. A great…