• 11-2 Work Orders Posting - automatic change to today for invoice date posting - wrong period

    I'm trying to close out last month's work orders. We close and post in the period per the last day of labor. ie: In work orders (11-2) I change the invoice date on the billing tab to the LDOL (ex. 06/12/23) -->> I then change the posting period to 6…
  • custom report columns not lining up after update

    Hey Everyone, I updated to version 22.4.44.0 from version 19.8 recently. Everything was going well until I tried to run a custom form/report....My columns are all out of place could anyone give me some guidance please. Thank You!
  • Posting in Job Cost after Job Cost Month is Closed

    Hello! We recently switched hosting providers. Not that this is related however our Project Accountant noted today that he was able to Post a Manual Job Cost entry to January 2020, which is a month that is closed in Job Cost. We have not had an issue…
  • Restrict Wage Rates

    FormerMember
    FormerMember
    Is there a way to restrict the wage rates from a payroll clerk entering time in Payroll Records?
  • Vehicles in Equipment Module

    Setting up new company and in the process of uploading company vehicles and equipment. The company has numerous pieces of construction equipment as well as multiple vehicles. Within the "Equipment Module" is there a method for specifying whether the item…
  • Sage 100 Contractor v19 End of Life/Tax Updates?

    Now that Contractor v20 is out, will there be tax table updates for 2017 still available in v19. Or, do I have to have v20 installed to continue processing payroll in 2017? Thanks
  • Sage Basic Estimating - Some general questions

    Hopefully someone here will be able to answer my questions. I just bought the basic estimating module because of its ability to tie in to the accounting. However, I have some questions that I cannot seem to get an answer on. - 1. Can the input grid…
  • Estimator / Project Manager Position

    South Bay Landscape Company is currently seeking a qualified Special Projects Estimator/Project Manager to join our team. This position requires an understanding of the complete bidding process of landscape installation or renovation of projects along…
  • Changing Job Cost Methodology

    Need to modify the Cost Codes in Sage 100 CRE. We have TOO many cost codes plus when they were originally set up that person used a 5 diget plus 3 decimal XXXXX.XXX cost code. Much too complicated for our field personnel to get it right. I want to change…
  • Closing 2001 zero balance payable invoice?

    In Sage 100 Contractor 2014 (U.S. Edition, version 19.4.58.0) I have a zero balance payable invoice from 2001 on a closed job I want to remove. I cannot remove the job because it keeps telling me there is an open payable invoice. How do I close the payable…
  • Importing Data

    Is there anyway to import anything into Sage 100 Contractor? Certainly there is some mechanism for migrating data from QuickBooks or Excel to Sage 100... right?
  • Labor Contractor Tracking

    Looking for suggestions on tracking labor contractor employee time daily by job/by cost code. Would like this information to flow through the payroll module but unable to pay vendors through that module. Curious how other companies track this data?